BEFORE YOU BEGIN
Read the reason before choosing the action.
A task has stopped, and you want to get it moving. Before you reach for Retry, open the task and read its current status. In Helmweave’s development version, the summary separates What happened, Why work stopped when an allowance is exhausted, What is still needed when known, and Next step. That gives you a place to start without asking an agent to reconstruct the situation. Viewing the task does not restart it.
01PERMISSION
Is an action waiting for permission?
Read the actual request: what action needs approval, where it will happen, and what access is missing. A plan approval and a computer’s privacy permission are different decisions. If the runner needs Screen Recording on a Mac, approving a request in Helmweave cannot switch that permission on in System Settings.
Complete the stated prerequisite on the host, then use the matching retry control so the agent can recheck it. Approval applies to the displayed request. It does not grant unrelated access or remove the task’s testing and verification requirements.
02WORK ALLOWANCE
Has the task used its work allowance?
A task can reach its allowed agent turns or working minutes while useful work remains. That is a different problem from missing permission. Review the saved progress and unfinished requirements before deciding whether to give it more time or change the assignment.
When development recovery has exhausted an allowance, the controls show the totals. Increase each reached limit beyond the work already used, then choose Save allowance & retry. Used work remains counted. A nudge such as “keep going” does not raise the allowance, grant permission or turn earlier output into a passing result.
03REJECTED EVIDENCE
Was the recovery evidence rejected?
Sometimes the problem is the proposed proof. A recovery proposal might cite installed tooling instead of current project evidence, omit which focused tests it runs, or change files during a read-only review. Those are reasons to inspect the task and its checks before another implementation attempt.
For recognized failures, Review task & checks can be offered when approvals, allowance and availability allow. Selecting it requests an investigation; simply reading the summary does nothing. Any proposed amendment still needs host review. A rejected proposal, or an invalid completion report, does not by itself establish that the implementation failed.
04SAVED CONTEXT
Keep the explanation and the record together.
The plain-language summary leaves the diagnostic available under Original blocker details. Existing evidence, agent output and task history remain available too. If the summary lists remaining work from the agent’s latest saved report, it labels that report as unverified. It is useful context, not confirmation that the work passed.
Recent recovery decisions (history) shows up to three recent rejected proposals with timestamps. Read them as earlier attempts, not accepted changes or fresh verification. More than one cause can apply: an action may have been refused before the task later exhausted its allowance. Addressing one does not automatically resolve the other.
WHAT YOU TAKE AWAY
A next step you can explain
Before continuing, you should be able to name the obstacle, the unfinished work and the action you are choosing. For the broader verification flow, read how evidence is reviewed. For a recorded example of a scoped retry, see the Daylight preview recovery.
CONTINUE EXPLORING
Research a decision
Explore whether a customer portal belongs in an existing website or a separate app. Frame the question, compare evidence and review the uncertainty.
Read the next guide